Oil Reconditioning Project
A critical project to recondition the control fluid (two tanks of capacity 16 KL each) for the India’s largest energy conglomerate and coal-based power producer with capacity of 4760 MW.
Read MoreCase Studies
Case Shot 1: Reconditioning of EH oil (West India)
A power plant in Western India using Chinese technology turbine EHC system saved 3.01 Cr approx. with MLC LVDH TRIX-20 EH Oil Filtration
Case Shot 2: Reconditioning of EH oil (North India)
A power plant in Northern India using Indo- Japanese technology turbine EHC system saved 1.5 Cr approx. with MLC LVDH TRIX-20 EH Oil Filtration
Case Shot 3: PE Fluid Reconditioning in Turbine EHC System
A 1,320 MW (2 x 660 MW), one of the first and largest supercritical coal-fired power plants using Indo-Chinese Turbine EHC System in Northern India.
Case Shot 4: Reconditioning of EH Oil (South India)
A 1200 MW coal-fired thermal power plant using Indo-Chinese Turbine EHC System in Southern India.
Case Shot 5: Reclamation of FRF
A 1200 MW coal-fired thermal power plant using Indo-Chinese Turbine EHC System in Southern India.
Case Shot 6: Lube Oil Reclamation from NAS 12 to NAS 3
Critical project successfully executed for ISO 9001 Certified - Millenium's shipbuilding yard under the Ministry of Ports, Shipping, and Waterways (Defence Sector).
Case Shot 7: Reduction of the TAN value of the control fluid from 0.23 to 0.08 mgKOH/gm
Team Minimac successfully executed a critical project to re-condition the control fluid (tank capacity 16 KL) for a 2*600 MW coal-based thermal power plant in Chhattisgarh.
Case Shot 8: Saved the plant from a major breakdown
The Minimac team successfully completed a critical flushing project in a Big Fertilizer company with a capacity of 4000 tonnes in Jharkhand.
Case Shot 9: Oil Reconditioning project for the India’s largest coal-based power producer
Team Minimac successfully executed a critical project to recondition the control fluid (two tanks of capacity 16 KL each) for the India’s largest energy conglomerate and coal-based power producer with capacity of 4760 MW.
Case Shot 10: Oil Reclamation project for the largest oil refinery in WB, India
A critical oil reclamation project for the largest oil refinery with a capacity of 8 million tonnes per year in West Bengal, India
Case Shot 11: Efficiently Eliminating Varnish from 23,500 Liters of Oil in Just 516 Hours
Mitigating a Potential Power Crisis in Western India through Varnish and Solid Contamination Removal
Case Shot 12: Effectively reducing the TAN Levels of 32kl of FRF Oil
Abating TAN Levels: Minimac's Tailored Solution for Critical Oil Values at India's 9th Largest Coal-Fired Power Plant
Case Shot 13: Preserving 35 kL of Prime 46 Oil from Solid and Moisture Impurities
Minimac Rescues Bihar Power Station : Customized Solution for Solid Contamination and Moisture Wins
Case Shot 14: Plant Renovation Unveils Critical Role of Hydraulic Flushing in New Compressor Setup- Minimac in Action
Implementation of Hydraulic Oil Flushing Mitigates Compressor Failures Effectively